Hercules U26Návod k obsluzeHERCULES Green Eco ThermMANUAL FOR BOILER OPERATION AND INSTALATION
10 Fig. no. 6 Basic components of the burner of boiler HERCULES Green Eco Therm XJ Fig. no. 7 Basic components of the burner of boiler HERCULES
11 Fig. no. 8 Positioning of thermal labels on the burner 4. Location and installation 4.1 Regulations and directives The solid fuel boiler c
12ČSN 33 2000-4-41 Electrical equipments: part 4: Safety chap. 41: Protection against electric shock ČSN 33 2000-5-51 ed. 2 Electrical regulations
132. A safe distance from the combustible materials: - when installing and operating the boiler it is necessary to keep a safety distance of 200
14• the manufacturer recommends that min. 1000 distance is kept between the boiler and fuel or the fuel is placed in a room different from that wher
15- washer 5,3 4 pcs - screw into the plate ST 4,2 x 9,5 6 pcs - spring clamp 4 pcs - bushing PG 9 7 pcs • control box 1 pc - screw M5 x 12 4
165.3 Assembly procedure 5.3.1 Boiler drum installation 1. Position the boiler body on a retaining wall. 2. Put sealing 90 x 60 x 3 (1) o
175.3.2 Mounting of partitions of the combustion chamber and turbulators 1. 1.According to Fig no. 13 insert the partitions of the combu
181. Please screw the flange of burner (see Fig. no. 15) onto the ash door by means of 3 pcs screws M10 x 30 (2), 1 pc screw M1
195.3.4 Mounting of the fuel reservoir ATTENTION! In the event that it is installed the supplied wooden fuel reservoir, it is necessary to place
2Contents: page 1. Produced variants of boiler ...
205.3.5 Mounting of the shells 1 Anchor screw 2 Console 1 3 Washer 10,5 4 Nut M10 5 Console 2 6 Right side part of shell 7 Insulation o
214. You will mount the connecting pins 2 pcs (8) on the right side part of the shell (6) and then insert the insulation (7). Then you will install
225.3.6.1 Version HERCULES Green Eco Therm XS 1. According to Fig no. 17 equip the upper part of the shell (15) with the glands PG 9 (20) 2. At
235.3.9 Electrical scheme Fig. no. 18a) Circuit diagram of HERCULES Green Eco Therm XJ *- operational thermostat is put out of its function S1
24 Fig. no. 18b) Circuit diagram of HERCULES Green Eco Therm XJ S1 MAIN SWITCH H1 SIGNALLING „SWITCHED ON“ F1 FUSE 10A Z1 SUPPRESSOR FILTER
25 Fig. no. 19a) Circuit diagram of HERCULES Green Eco Therm XS S1 MAIN SWITCH H1 SIGNALLING „SWITCHED ON“ F1 FUSE 10 A Z1 SUPPRESSOR FILTE
26 Fig. no. 19b) Circuit diagram of HERCULES Green Eco Therm XS S1 MAIN SWITCH H1 SIGNALLING „SWITCHED ON“ F1 FUSE 10A Z1 SUPPRESSOR FILTE
275.3.10 Boiler hydraulic diagram Fig. no. 20 HERCULES Green Eco Therm boiler hydraulic diagram Fig. no. 21 HERCULES Green Eco Therm boiler hyd
286. Putting into operation - instructions for contractual service organization The boiler can only be put into operation by a contractual service
297. Boiler operation by user Before putting the boiler into operation or in case that the fuel feeder is empty during operation and
3Dear customer, thank you for the purchase of HERCULES Green Eco Therm boiler; this purchase demonstrates your confidence in VIADRUS a.s. In order
30After putting the burner into operation the following message appears on the display: S-+ESC The display shows information about the current ope
31After a successful ignition of fuel the operation of burner will continue to operate according to the factory setting in order to sta
32Items of user menu of control module of burner The user menu starts up on the display by a long pressing the button "S". By pressing t
33S-+ESC ATTENTION: In case that the fuel has changed (for instance the class of pellets has changed), then an additional adjustment
34S-+ESC After the extinction of the burner, the display shows "Activate" (initial screen display). If the burner is not in use for a lo
35The list of latest 10 faults that occurred during the burner operation To check the latest faults that occurred during the burner operation, ente
36Tab. no. 5 The faults which are displayed on the display of the burner (25J and 32J). The text which is shown on display Description The way of
377.2 Version HERCULES Green Eco Therm XS Putting the burner into operation: • The main switch must be in the position on(I) - (green light of ma
38 Fig. No.23 The burner is automatically shut down after reaching the desired temperature that is set by the operating thermostat (the fan carries
39Putting the burner out of operation • The burner is put out of operation by pressing "START OF BURNER" button (signalling of "STA
42. Technical data of the boiler Tab. no. 1 Dimensions, thermal parameters of boiler Version of boiler HERCULES Green Eco Therm 25X HERCULES Gr
40Tab. no. 7 Description of operating parameters of control module of burner 32S number of flickers of yellow LED Index of potentiometer P1 P2 P3 P
41Example of calculating the heat output of the burner: • Determine the amount of fuel supplied per hour - mfuel = 5.3 kg / hr. Calculate the insta
428. IMPORTANT WARNINGS 1. The boiler must not be used for other purposes than those it is designed for. 2. The boiler can only be operated by a
439. Maintenance 1) Regularly remove ashes from the combustion chamber and the ash drawer. The ashes must be thrown out into non-combustible cont
44 Fig. no. 25 Fig. no. 26 End position of the grate The body of burner Inclined grate of combustion chamber 1. Initial position of the grat
4510. Faults and their removal Tab. no. 10 Faults and their removal Operating fault The cause Solution Failure to reach the desired room
46Operating fault The cause Solution Flame has a purple colour and at the outlet to the chimney can be observed smoke Fuel of poor quality It i
4711. Instructions for product liquidation after its operating life VIADRUS a.s. is contractual partner of firm EKO–KOM a.s. with client number F0
48Information for customer Packaging edentification PE Plastic sacks, folie, corrugaled board, iron and plastic fix line Assessment reference Ide
49Destined for user VIADRUS a.s Bezručova 300 735 81 Bohumín Guarantee certificate and Quality & completeness certificate for HERCULES Green
505010015020025030015 20 25 30 35 40 45 50 55 60 Fig. no. 1 Hydraulic loss of the boiler drum Version of boiler HERCULES Green Eco Therm 25X H
50Annex to the guarantee certificate for the customer-user Record of the carried out guarantee and after-guarantee repairs and regular product ins
51Destined for service organization VIADRUS a.s Bezručova 300 735 81 Bohumín Guarantee certificate and Quality & completeness certificate for
53Destined for manufacturer VIADRUS a.s Bezručova 300 735 81 Bohumín Guarantee certificate and Quality & completeness certificate for HERCULE
54
55
56 Update 2/2013 – GB
63. Boiler description 3.1 Boiler drum construction The cast iron section boiler drum is the main part of boiler and it is manufactured of grey c
7Elements for control, regulation and safety placed on the boiler body The air rosette of cleaning door and the lower stifling element is not used a
8 1. Boiler drum 2. Boiler shell with ashtray 3. Cleaning door 4. Burner 5. Transitionary flange 6. Insulation of transitionary flange 7. T
93.2 The construction of burner and transport routes of the fuel The version HERCULES Green Eco Therm XJ • Control module with microprocessor; •