Viadrus Hercules P 1 Manuel de service

Naviguer en ligne ou télécharger Manuel de service pour Chauffe-eau et chaudières Viadrus Hercules P 1. Viadrus Hercules P 1 Technical data Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - HERCULES Green Eco Therm

Hercules U26Návod k obsluzeHERCULES Green Eco ThermMANUAL FOR BOILER OPERATION AND INSTALATION

Page 2 - Contents:

10 Fig. no. 6 Basic components of the burner of boiler HERCULES Green Eco Therm XJ Fig. no. 7 Basic components of the burner of boiler HERCULES

Page 3 - HERCULES Green Eco Therm X X

11 Fig. no. 8 Positioning of thermal labels on the burner 4. Location and installation 4.1 Regulations and directives The solid fuel boiler c

Page 4

12ČSN 33 2000-4-41 Electrical equipments: part 4: Safety chap. 41: Protection against electric shock ČSN 33 2000-5-51 ed. 2 Electrical regulations

Page 5 - Version of boiler

132. A safe distance from the combustible materials: - when installing and operating the boiler it is necessary to keep a safety distance of 200

Page 6 - 3. Boiler description

14• the manufacturer recommends that min. 1000 distance is kept between the boiler and fuel or the fuel is placed in a room different from that wher

Page 7

15- washer 5,3 4 pcs - screw into the plate ST 4,2 x 9,5 6 pcs - spring clamp 4 pcs - bushing PG 9 7 pcs • control box 1 pc - screw M5 x 12 4

Page 8

165.3 Assembly procedure 5.3.1 Boiler drum installation 1. Position the boiler body on a retaining wall. 2. Put sealing 90 x 60 x 3 (1) o

Page 9

175.3.2 Mounting of partitions of the combustion chamber and turbulators 1. 1.According to Fig no. 13 insert the partitions of the combu

Page 10

181. Please screw the flange of burner (see Fig. no. 15) onto the ash door by means of 3 pcs screws M10 x 30 (2), 1 pc screw M1

Page 11 - *) Recommended value

195.3.4 Mounting of the fuel reservoir ATTENTION! In the event that it is installed the supplied wooden fuel reservoir, it is necessary to place

Page 12 - 680 872

2Contents: page 1. Produced variants of boiler ...

Page 13

205.3.5 Mounting of the shells 1 Anchor screw 2 Console 1 3 Washer 10,5 4 Nut M10 5 Console 2 6 Right side part of shell 7 Insulation o

Page 14 - 5.1 Order

214. You will mount the connecting pins 2 pcs (8) on the right side part of the shell (6) and then insert the insulation (7). Then you will install

Page 15

225.3.6.1 Version HERCULES Green Eco Therm XS 1. According to Fig no. 17 equip the upper part of the shell (15) with the glands PG 9 (20) 2. At

Page 16 - 5.3 Assembly procedure

235.3.9 Electrical scheme Fig. no. 18a) Circuit diagram of HERCULES Green Eco Therm XJ *- operational thermostat is put out of its function S1

Page 17 - 5.3.3 Mounting of burner

24 Fig. no. 18b) Circuit diagram of HERCULES Green Eco Therm XJ S1 MAIN SWITCH H1 SIGNALLING „SWITCHED ON“ F1 FUSE 10A Z1 SUPPRESSOR FILTER

Page 18

25 Fig. no. 19a) Circuit diagram of HERCULES Green Eco Therm XS S1 MAIN SWITCH H1 SIGNALLING „SWITCHED ON“ F1 FUSE 10 A Z1 SUPPRESSOR FILTE

Page 19 - The assembled

26 Fig. no. 19b) Circuit diagram of HERCULES Green Eco Therm XS S1 MAIN SWITCH H1 SIGNALLING „SWITCHED ON“ F1 FUSE 10A Z1 SUPPRESSOR FILTE

Page 20

275.3.10 Boiler hydraulic diagram Fig. no. 20 HERCULES Green Eco Therm boiler hydraulic diagram Fig. no. 21 HERCULES Green Eco Therm boiler hyd

Page 21

286. Putting into operation - instructions for contractual service organization The boiler can only be put into operation by a contractual service

Page 22

297. Boiler operation by user Before putting the boiler into operation or in case that the fuel feeder is empty during operation and

Page 23 - 5.3.9 Electrical scheme

3Dear customer, thank you for the purchase of HERCULES Green Eco Therm boiler; this purchase demonstrates your confidence in VIADRUS a.s. In order

Page 24

30After putting the burner into operation the following message appears on the display: S-+ESC The display shows information about the current ope

Page 25 - FEEDING

31After a successful ignition of fuel the operation of burner will continue to operate according to the factory setting in order to sta

Page 26

32Items of user menu of control module of burner The user menu starts up on the display by a long pressing the button "S". By pressing t

Page 27

33S-+ESC ATTENTION: In case that the fuel has changed (for instance the class of pellets has changed), then an additional adjustment

Page 28

34S-+ESC After the extinction of the burner, the display shows "Activate" (initial screen display). If the burner is not in use for a lo

Page 29 - 7. Boiler operation by user

35The list of latest 10 faults that occurred during the burner operation To check the latest faults that occurred during the burner operation, ente

Page 30

36Tab. no. 5 The faults which are displayed on the display of the burner (25J and 32J). The text which is shown on display Description The way of

Page 31

377.2 Version HERCULES Green Eco Therm XS Putting the burner into operation: • The main switch must be in the position on(I) - (green light of ma

Page 32

38 Fig. No.23 The burner is automatically shut down after reaching the desired temperature that is set by the operating thermostat (the fan carries

Page 33 - BURNER“

39Putting the burner out of operation • The burner is put out of operation by pressing "START OF BURNER" button (signalling of "STA

Page 34 - [YES] [NO]

42. Technical data of the boiler Tab. no. 1 Dimensions, thermal parameters of boiler Version of boiler HERCULES Green Eco Therm 25X HERCULES Gr

Page 35 - LOG error 1:22

40Tab. no. 7 Description of operating parameters of control module of burner 32S number of flickers of yellow LED Index of potentiometer P1 P2 P3 P

Page 36

41Example of calculating the heat output of the burner: • Determine the amount of fuel supplied per hour - mfuel = 5.3 kg / hr. Calculate the insta

Page 37

428. IMPORTANT WARNINGS 1. The boiler must not be used for other purposes than those it is designed for. 2. The boiler can only be operated by a

Page 38

439. Maintenance 1) Regularly remove ashes from the combustion chamber and the ash drawer. The ashes must be thrown out into non-combustible cont

Page 39

44 Fig. no. 25 Fig. no. 26 End position of the grate The body of burner Inclined grate of combustion chamber 1. Initial position of the grat

Page 40

4510. Faults and their removal Tab. no. 10 Faults and their removal Operating fault The cause Solution Failure to reach the desired room

Page 41 - Fault statuses of burner

46Operating fault The cause Solution Flame has a purple colour and at the outlet to the chimney can be observed smoke Fuel of poor quality It i

Page 42 - 8. IMPORTANT WARNINGS

4711. Instructions for product liquidation after its operating life VIADRUS a.s. is contractual partner of firm EKO–KOM a.s. with client number F0

Page 43 - 9. Maintenance

48Information for customer Packaging edentification PE Plastic sacks, folie, corrugaled board, iron and plastic fix line Assessment reference Ide

Page 44

49Destined for user VIADRUS a.s Bezručova 300 735 81 Bohumín Guarantee certificate and Quality & completeness certificate for HERCULES Green

Page 45

505010015020025030015 20 25 30 35 40 45 50 55 60 Fig. no. 1 Hydraulic loss of the boiler drum Version of boiler HERCULES Green Eco Therm 25X H

Page 46

50Annex to the guarantee certificate for the customer-user Record of the carried out guarantee and after-guarantee repairs and regular product ins

Page 47

51Destined for service organization VIADRUS a.s Bezručova 300 735 81 Bohumín Guarantee certificate and Quality & completeness certificate for

Page 49

53Destined for manufacturer VIADRUS a.s Bezručova 300 735 81 Bohumín Guarantee certificate and Quality & completeness certificate for HERCULE

Page 52

56 Update 2/2013 – GB

Page 53

63. Boiler description 3.1 Boiler drum construction The cast iron section boiler drum is the main part of boiler and it is manufactured of grey c

Page 54

7Elements for control, regulation and safety placed on the boiler body The air rosette of cleaning door and the lower stifling element is not used a

Page 55

8 1. Boiler drum 2. Boiler shell with ashtray 3. Cleaning door 4. Burner 5. Transitionary flange 6. Insulation of transitionary flange 7. T

Page 56 - Update 2/2013 – GB

93.2 The construction of burner and transport routes of the fuel The version HERCULES Green Eco Therm XJ • Control module with microprocessor; •

Commentaires sur ces manuels

Pas de commentaire